MCFI Tanks Conversion
MCFI Tanks Conversion

Conversion and painting of EX-MCFI ammonia tanks A & B for heated HFO 380 storage, including new pumping station and heating system. Refurbishment and upgrading to Total and API650/653 standard. Please browse gallery for more project details.

MCFI Tanks Conversion
MCFI Tanks Conversion

Removal of external insulation and internal insulated suspended roof. Modification of all shell and roof nozzles Design and installation of tank internal heating coils and draw-off heater and interconnecting pipework to hot oil boiler

MCFI Tanks Conversion
MCFI Tanks Conversion

Internal and external surface preparation and coating of the tanks. Design and construction of roof inter-connecting bridge to tie 2 tanks. Construction of bund walls and interconnecting pipework to existing distribution and reception pipework in port area.

MCFI Tanks Conversion
MCFI Tanks Conversion

Conversion and painting of EX-MCFI ammonia tanks A & B for heated HFO 380 storage, including new pumping station and heating system. Refurbishment and upgrading to Total and API650/653 standard. Please browse gallery for more project details.

1/3
CEB Pointe Monnier
CEB Pointe Monnier

Electro-mechanical works for Phase-1 of CEB power station at Pointe Monnier, Rodrigues. Please browse gallery for more project details

CEB Pointe Monnier
CEB Pointe Monnier

Installation of the whole electro-mechanical works for the 2 diesel sets for Phase-1 . Included fuel system, cooling system, control pipework, erection of a 330m3 HFO storage tank, fuel filtering, system, pipe racks, installation of service overhead travelling crane for the engines, erection of chimney stack, design and construction of fire-fighting tank and related systems. Supply and installation of HFO transfer pumps with controls from Port-Mathurin tank farm.

CEB Pointe Monnier
CEB Pointe Monnier

Electro-mechanical works for Phase-1 of CEB power station at Pointe Monnier, Rodrigues. Please browse gallery for more project details

1/2
CEB Fort William
CEB Fort William

Design and construction of 5000m3 HFO tank to API 650 at F.William for CEB Please browse gallery for more details.

CEB Fort William
CEB Fort William

Design and construction of a 5,000m3 HFO tank, including inter-connecting pipework to existing tanks. Turnkey project with all civil and concrete works, tank foundations, bund wall modifications, impressed current cathodic protection system.

CEB Fort William
CEB Fort William

Tank erected by “jack-up” method, and project completed in record time of 6 months. Also included retro-fitting of tank gauging instrumentation to adjoining existing tank.

CEB Fort William
CEB Fort William

Design and construction of 5000m3 HFO tank to API 650 at F.William for CEB Please browse gallery for more details.

1/3