CEB Pointe Monnier

Installation of the whole electro-mechanical works for the 2 diesel sets for Phase-1 . Included fuel system, cooling system, control pipework, erection of a 330m3 HFO storage tank, fuel filtering, system, pipe racks, installation of service overhead travelling crane for the engines, erection of chimney stack, design and construction of fire-fighting tank and related systems. Supply and installation of HFO transfer pumps with controls from Port-Mathurin tank farm.